El rancho (sometimes referred to as John's Cathedral) is looking great. All of the electrical is finished, light fixtures have been hung and we have running water in both the bathroom shower and the outdoor shower.
Today, the team started laying the ceramic floors in the rancho and baño.
The glass block window in the bathroom looks great. As soon as the bathroom tile is in, they will install the bathroom sink and toilet.
After they finish with the ceramic floor in the rancho, they will tile the rancho counters and paint the walls. We expect everything should be finished sometime next week.
No comments:
Post a Comment