
Our perimeter wall is constructed of precast concrete panels measuring 1 x .5 meters each. These panels are designed to slip into steel reinforced concrete posts. Multiple panels can then be stacked, one on top of the next, like you see in this picture.
Here in the States, the panels are usually moved into position by crane. John had asked me what type of equipment is used in Costa Rica to accomplish this and I replied with this photo.

Once the concrete panels were in place, they welded steel reinforcing beams along the top edge and filled all the concrete seams.

The final step was an application of pre-colored stucco to give us a maintenance free finish. The construction crew usually worked from 7 AM until 5 PM, with the government mandated breaks. Thirty minutes for the morning and afternoon coffee breaks and an hour for lunch. The team also worked from 7 AM until 12 noon on Saturdays.
They did an excelled job and the finished results give us a beautiful perimeter wall, a new automatic sprinkler system, a concrete driveway and a electric gate.






We have already made our travel arrangements for our next trip during the upcoming rainy season. This time we will plant grass, fruit trees, shrubs and flowering vines on our new fence.
No comments:
Post a Comment